20230216 Piecing everything together

20230216 Piecing everything together

Whelp, it’s almost a month since the Chinese New Year and most of the parts I have ordered are starting to arrive. It takes anywhere between 4 to 8 weeks for the items to arrive and by then, I kinda lose steam on the projects. Sure, there are other ways such as paying more for […]

20230201 Every Milliseconds Counts

20230201 Every Milliseconds Counts

The basic programming for the Engines are more or less done. The effects are close enough but in terms of timing, it is still not there yet. You see, the timing from startup to the engines on full blast, is about 2 seconds. And in that time frame, there’s a lot of exciting things happening. […]

20230126 The Control Board

20230126 The Razor Crest Control Board

It took about 16 days (right through the Chinese New Year) for JLCPCB to process and deliver my design to me. And I am quite happy. However, looking at the boards, methinks there could be a possible version 3.0 Right now, this is version 2.0. There was no version 1.0 as the ULN2003 Darlington Pair […]